{"id":1031,"date":"2026-09-08T08:02:25","date_gmt":"2026-09-08T08:02:25","guid":{"rendered":"https:\/\/marina-sa.com\/?post_type=blogs&#038;p=1031"},"modified":"2026-09-12T03:33:27","modified_gmt":"2026-09-12T03:33:27","slug":"%d8%a3%d8%a8%d8%b9%d8%a7%d8%af-%d8%a8%d8%a6%d8%b1-%d8%a7%d9%84%d9%85%d8%b5%d8%b9%d8%af","status":"publish","type":"blogs","link":"https:\/\/marina-sa.com\/en\/blogs\/%d8%a3%d8%a8%d8%b9%d8%a7%d8%af-%d8%a8%d8%a6%d8%b1-%d8%a7%d9%84%d9%85%d8%b5%d8%b9%d8%af\/","title":{"rendered":"An Error in Elevator Shaft Dimensions Can Restrict Your Project: What Should Be Reviewed Before Casting Concrete?"},"content":{"rendered":"<p><\/p>\n<p data-start=\"629\" data-end=\"799\">If your project is still in the structural construction stage, confirming the elevator shaft dimensions before concrete casting is not a detail that can be postponed.<\/p>\n<p data-start=\"801\" data-end=\"1006\">These dimensions will subsequently affect the cabin type, door opening, pit depth, overhead clearance, component fixing points, and the ability to install a system suitable for the building\u2019s intended use.<\/p>\n<p data-start=\"1008\" data-end=\"1396\">More importantly, elevator shaft dimensions before concrete casting should not be selected according to a fixed measurement assumed to suit every project. They should be determined according to the selected elevator specifications, capacity, speed, number of stops, operating system, and entrance arrangement, with architectural, structural, and electrical requirements also reviewed.<\/p>\n<p data-start=\"1398\" data-end=\"1584\">This guide explains what should be checked before closing the formwork and casting the concrete and how to reduce coordination errors that may lead to expensive structural modifications.<\/p>\n<h2 data-section-id=\"11ittnw\" data-start=\"1586\" data-end=\"1602\">Quick Summary<\/h2>\n<ul data-start=\"1604\" data-end=\"2306\">\n<li data-section-id=\"qx38zv\" data-start=\"1604\" data-end=\"1749\">There are no universal shaft dimensions for all elevators; the final size depends on the system specifications and the manufacturer\u2019s drawings.<\/li>\n<li data-section-id=\"afhnbi\" data-start=\"1750\" data-end=\"1900\">Elevator shaft dimensions before concrete casting should include the width and depth, as well as the pit, overhead clearance, and door openings.<\/li>\n<li data-section-id=\"1o57eh6\" data-start=\"1901\" data-end=\"2054\">The elevator drawing should be approved before concrete casting through coordination between the architect, structural engineer, and elevator supplier.<\/li>\n<li data-section-id=\"vtvry4\" data-start=\"2055\" data-end=\"2165\">Vertical alignment, clearances, loads, and fixing points are as important as the shaft\u2019s nominal dimensions.<\/li>\n<li data-section-id=\"16lex3v\" data-start=\"2166\" data-end=\"2306\">In Saudi Arabia, the design should be coordinated with the applicable Saudi Building Code requirements and relevant technical regulations.<\/li>\n<\/ul>\n<h2 data-section-id=\"32y6f8\" data-start=\"2308\" data-end=\"2391\">Why Are Elevator Shaft Dimensions Before Concrete Casting a Structural Decision?<\/h2>\n<p data-start=\"2393\" data-end=\"2575\">The elevator shaft is the vertical space within which the cabin and its components move. It is therefore part of the building rather than simply an empty area reserved for equipment.<\/p>\n<p data-start=\"2577\" data-end=\"2792\">When concrete work is completed before the elevator drawings are approved, any subsequent change may require demolition, reshaping of openings, modification of finishes, or alteration of the elevator specifications.<\/p>\n<p data-start=\"2794\" data-end=\"3060\">The decision becomes even more sensitive in Saudi projects requiring early coordination between different design disciplines. The Saudi Building Code also aims to achieve minimum safety, durability, and structural stability requirements for buildings and facilities.<\/p>\n<h2 data-section-id=\"2h81jg\" data-start=\"3062\" data-end=\"3131\">What Determines Elevator Shaft Dimensions Before Concrete Casting?<\/h2>\n<h3 data-section-id=\"fj3czk\" data-start=\"3133\" data-end=\"3174\">1. Elevator Type and Operating System<\/h3>\n<p data-start=\"3176\" data-end=\"3339\">Begin by selecting the system rather than the dimensions. Then confirm the elevator shaft dimensions before concrete casting according to the approved drawing.<\/p>\n<p data-start=\"3341\" data-end=\"3485\">Traction elevators, hydraulic elevators, home elevators, passenger elevators, and freight elevators may all have different spatial requirements.<\/p>\n<p data-start=\"3487\" data-end=\"3654\">The dimensions must therefore be obtained from the technical drawing for the selected system rather than copied from a commonly used measurement in a previous project.<\/p>\n<h3 data-section-id=\"y692jr\" data-start=\"3656\" data-end=\"3697\">2. Cabin Dimensions and Load Capacity<\/h3>\n<p data-start=\"3699\" data-end=\"3781\">Changes in capacity and use affect the cabin dimensions and component arrangement.<\/p>\n<p data-start=\"3783\" data-end=\"3953\">The requirement to transport a hospital bed or wheelchair may result in different entrance, cabin, and circulation dimensions from those of a standard passenger elevator.<\/p>\n<p data-start=\"3955\" data-end=\"4084\">A commonly used size is therefore insufficient. The cabin must be coordinated with the capacity, intended use, and elevator type.<\/p>\n<h3 data-section-id=\"42z2rl\" data-start=\"4086\" data-end=\"4137\">3. Elevator Door Opening and Entrance Direction<\/h3>\n<p data-start=\"4139\" data-end=\"4209\">The door opening is not equal to the dimensions of the cabin or shaft.<\/p>\n<p data-start=\"4211\" data-end=\"4242\">The following must be reviewed:<\/p>\n<ul data-start=\"4244\" data-end=\"4358\">\n<li data-section-id=\"18rivm7\" data-start=\"4244\" data-end=\"4263\">Clear door width.<\/li>\n<li data-section-id=\"vwe6so\" data-start=\"4264\" data-end=\"4276\">Door type.<\/li>\n<li data-section-id=\"viixxl\" data-start=\"4277\" data-end=\"4293\">Door position.<\/li>\n<li data-section-id=\"1xgecpj\" data-start=\"4294\" data-end=\"4314\">Opening direction.<\/li>\n<li data-section-id=\"1hc4dgd\" data-start=\"4315\" data-end=\"4358\">Space required around the frame and sill.<\/li>\n<\/ul>\n<p data-start=\"4360\" data-end=\"4545\">A common mistake is to construct the opening according to an approximate architectural measurement and later discover that the actual door details require a different width or position.<\/p>\n<h3 data-section-id=\"k7jfup\" data-start=\"4547\" data-end=\"4586\">4. Pit Depth and Overhead Clearance<\/h3>\n<p data-start=\"4588\" data-end=\"4737\">The pit depth and free space above the highest stop, or headroom, are among the most important elevator shaft dimensions before concrete casting.<\/p>\n<p data-start=\"4739\" data-end=\"4891\">These dimensions depend on the elevator type, speed, components, and safety arrangement. They are not additional spaces that can be reduced arbitrarily.<\/p>\n<p data-start=\"4893\" data-end=\"5089\">EN 81-20 addresses safety spaces and clearances within the pit. It also requires the shaft structure to withstand loads generated by the equipment, guide rails, and different operating conditions.<\/p>\n<h3 data-section-id=\"z7gru3\" data-start=\"5091\" data-end=\"5121\">5. Loads and Fixing Points<\/h3>\n<p data-start=\"5123\" data-end=\"5235\">The elevator shaft requires walls, floors, and ceilings capable of supporting the loads specified in the design.<\/p>\n<p data-start=\"5237\" data-end=\"5416\">The structural team must know where guide rails and other components will be fixed and check whether any beams, columns, or structural elements interfere with the elevator\u2019s path.<\/p>\n<h2 data-section-id=\"y6gaao\" data-start=\"5418\" data-end=\"5498\">What Should Be Reviewed in Elevator Shaft Dimensions Before Concrete Casting?<\/h2>\n<p data-start=\"5500\" data-end=\"5564\">Use the following table as a hold point before concrete casting:<\/p>\n<div class=\"group TyagGW_tableContainer TyagGW_tableContainerWithTableOfContents\">\n<div class=\"TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"5566\" data-end=\"6319\">\n<thead data-start=\"5566\" data-end=\"5601\">\n<tr data-start=\"5566\" data-end=\"5601\">\n<th class=\"last:pe-10\" data-start=\"5566\" data-end=\"5573\" data-col-size=\"sm\">Item<\/th>\n<th class=\"last:pe-10\" data-start=\"5573\" data-end=\"5601\" data-col-size=\"md\">What Should Be Verified?<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"5612\" data-end=\"6319\">\n<tr data-start=\"5612\" data-end=\"5680\">\n<td data-start=\"5612\" data-end=\"5632\" data-col-size=\"sm\">Elevator type<\/td>\n<td data-start=\"5632\" data-end=\"5680\" data-col-size=\"md\">System, capacity, speed, and number of stops<\/td>\n<\/tr>\n<tr data-start=\"5681\" data-end=\"5745\">\n<td data-start=\"5681\" data-end=\"5704\" data-col-size=\"sm\">Shaft dimensions<\/td>\n<td data-start=\"5704\" data-end=\"5745\" data-col-size=\"md\">Clear width and depth after finishing<\/td>\n<\/tr>\n<tr data-start=\"5746\" data-end=\"5822\">\n<td data-start=\"5746\" data-end=\"5763\" data-col-size=\"sm\">Grid lines<\/td>\n<td data-start=\"5763\" data-end=\"5822\" data-col-size=\"md\">Shaft alignment with architectural and structural grids<\/td>\n<\/tr>\n<tr data-start=\"5823\" data-end=\"5886\">\n<td data-start=\"5823\" data-end=\"5835\" data-col-size=\"sm\">Doors<\/td>\n<td data-start=\"5835\" data-end=\"5886\" data-col-size=\"md\">Opening widths, levels, and entrance directions<\/td>\n<\/tr>\n<tr data-start=\"5887\" data-end=\"5961\">\n<td data-start=\"5887\" data-end=\"5897\" data-col-size=\"sm\">Pit<\/td>\n<td data-start=\"5897\" data-end=\"5961\" data-col-size=\"md\">Depth, waterproofing, drainage, and safe-access requirements<\/td>\n<\/tr>\n<tr data-start=\"5962\" data-end=\"6018\">\n<td data-start=\"5962\" data-end=\"5977\" data-col-size=\"sm\">Headroom<\/td>\n<td data-start=\"5977\" data-end=\"6018\" data-col-size=\"md\">Height and clearances above the cabin<\/td>\n<\/tr>\n<tr data-start=\"6019\" data-end=\"6085\">\n<td data-start=\"6019\" data-end=\"6031\" data-col-size=\"sm\">Walls<\/td>\n<td data-start=\"6031\" data-end=\"6085\" data-col-size=\"md\">Vertical alignment, thicknesses, and fixing points<\/td>\n<\/tr>\n<tr data-start=\"6086\" data-end=\"6158\">\n<td data-start=\"6086\" data-end=\"6113\" data-col-size=\"sm\">Structural conflicts<\/td>\n<td data-start=\"6113\" data-end=\"6158\" data-col-size=\"md\">Beams, columns, services, and projections<\/td>\n<\/tr>\n<tr data-start=\"6159\" data-end=\"6236\">\n<td data-start=\"6159\" data-end=\"6184\" data-col-size=\"sm\">Electrical systems<\/td>\n<td data-start=\"6184\" data-end=\"6236\" data-col-size=\"md\">Power and control routes and system requirements<\/td>\n<\/tr>\n<tr data-start=\"6237\" data-end=\"6319\">\n<td data-start=\"6237\" data-end=\"6253\" data-col-size=\"sm\">Documents<\/td>\n<td data-start=\"6253\" data-end=\"6319\" data-col-size=\"md\">Approved drawing and technical data from the elevator supplier<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p data-start=\"6321\" data-end=\"6471\">This review ensures that the elevator shaft dimensions before concrete casting result from engineering coordination rather than on-site judgement.<\/p>\n<h2 data-section-id=\"5w91yn\" data-start=\"6473\" data-end=\"6519\">Common Errors That May Restrict the Project<\/h2>\n<p data-start=\"6521\" data-end=\"6599\">The most expensive mistake is casting the shaft before approving the elevator.<\/p>\n<p data-start=\"6601\" data-end=\"6629\">Other common errors include:<\/p>\n<ul data-start=\"6631\" data-end=\"6933\">\n<li data-section-id=\"1g8bfwl\" data-start=\"6631\" data-end=\"6695\">Using a \u201cstandard\u201d measurement without identifying the system.<\/li>\n<li data-section-id=\"1jz1qvy\" data-start=\"6696\" data-end=\"6773\">Measuring the unfinished opening rather than the required clear dimensions.<\/li>\n<li data-section-id=\"1jvkgko\" data-start=\"6774\" data-end=\"6807\">Ignoring finishing thicknesses.<\/li>\n<li data-section-id=\"ugsaa9\" data-start=\"6808\" data-end=\"6871\">Failing to control the vertical alignment of the shaft walls.<\/li>\n<li data-section-id=\"179jcsq\" data-start=\"6872\" data-end=\"6933\">Installing unrelated services or openings inside the shaft.<\/li>\n<\/ul>\n<p data-start=\"6935\" data-end=\"7123\">Elevator safety requirements restrict the use of the shaft for other purposes. Services should therefore be coordinated in advance rather than allowed to interfere with equipment movement.<\/p>\n<h2 data-section-id=\"uh59ew\" data-start=\"7125\" data-end=\"7215\">Are There Standard Elevator Shaft Dimensions Before Concrete Casting for Every Project?<\/h2>\n<p data-start=\"7217\" data-end=\"7353\">No. Dimensions and schedules may differ between suppliers and systems according to capacity, speed, door type, and entrance arrangement.<\/p>\n<p data-start=\"7355\" data-end=\"7623\">The recommended practice when determining elevator shaft dimensions before concrete casting is to obtain a specific dimension sheet or technical drawing for the selected elevator and coordinate it with the architectural and structural drawings before construction.<\/p>\n<h2 data-section-id=\"1qoiq6f\" data-start=\"7625\" data-end=\"7663\">When Do You Need a Custom Solution?<\/h2>\n<p data-start=\"7665\" data-end=\"7728\">A custom design or manufacturing solution may be required when:<\/p>\n<ul data-start=\"7730\" data-end=\"7933\">\n<li data-section-id=\"1pf8gvh\" data-start=\"7730\" data-end=\"7781\">The available site dimensions are unconventional.<\/li>\n<li data-section-id=\"1gzaf41\" data-start=\"7782\" data-end=\"7820\">Structural restrictions are present.<\/li>\n<li data-section-id=\"4hctwc\" data-start=\"7821\" data-end=\"7871\">The project requires a special door arrangement.<\/li>\n<li data-section-id=\"1bgrg1m\" data-start=\"7872\" data-end=\"7933\">The capacity or intended use differs from standard systems.<\/li>\n<\/ul>\n<p data-start=\"7935\" data-end=\"8108\">The objective is not to force an elevator into an existing shaft. The constraints should be studied first, followed by the selection or development of a compatible solution.<\/p>\n<p data-start=\"8110\" data-end=\"8312\">Marina Platforms Saudi Arabia provides customised project solutions alongside standard elevators. Its home-elevator service also allows dimensions and finishes to be customised according to the project.<\/p>\n<h2 data-section-id=\"tb9cb9\" data-start=\"8314\" data-end=\"8380\">How Can Marina Platforms Saudi Arabia Help Before Construction?<\/h2>\n<p data-start=\"8382\" data-end=\"8556\">Marina\u2019s elevator service begins with project assessment and engineering consultation, followed by design, procurement, installation, testing, commissioning, and maintenance.<\/p>\n<p data-start=\"8558\" data-end=\"8717\">Reviewing elevator shaft dimensions before concrete casting is therefore a logical part of early coordination between the building and its elevator system.<\/p>\n<p data-start=\"8719\" data-end=\"8865\">Marina provides solutions covering passenger, villa, freight, vehicle, and food elevators, together with home elevators and made-to-order systems.<\/p>\n<p data-start=\"8867\" data-end=\"9035\">The company\u2019s process begins with project assessment and planning before progressing to engineering design, manufacturing, installation, commissioning, and maintenance.<\/p>\n<h2 data-section-id=\"1gk7390\" data-start=\"9037\" data-end=\"9109\">Final Checklist for Elevator Shaft Dimensions Before Concrete Casting<\/h2>\n<p data-start=\"9111\" data-end=\"9169\">Before approving the concrete pour, confirm the following:<\/p>\n<ol data-start=\"9171\" data-end=\"9984\">\n<li data-section-id=\"yauekt\" data-start=\"9171\" data-end=\"9251\">The elevator type, capacity, speed, and number of stops have been determined.<\/li>\n<li data-section-id=\"1ar3wi2\" data-start=\"9252\" data-end=\"9343\">The shaft drawing has been approved by the elevator supplier and engineering consultant.<\/li>\n<li data-section-id=\"58tt8r\" data-start=\"9344\" data-end=\"9436\">The width and depth have been measured according to the reference defined in the drawing.<\/li>\n<li data-section-id=\"16nfrgd\" data-start=\"9437\" data-end=\"9495\">The pit, headroom, and final levels have been reviewed.<\/li>\n<li data-section-id=\"lb9e74\" data-start=\"9496\" data-end=\"9568\">Door openings have been coordinated with grid lines and floor levels.<\/li>\n<li data-section-id=\"171vbfs\" data-start=\"9569\" data-end=\"9650\">Guide-rail fixing points, components, and structural loads have been reviewed.<\/li>\n<li data-section-id=\"1j17kyq\" data-start=\"9651\" data-end=\"9722\">No beams, services, or projections interfere with the elevator path.<\/li>\n<li data-section-id=\"15ujchw\" data-start=\"9723\" data-end=\"9808\">Construction tolerances and finishing details have been documented before casting.<\/li>\n<li data-section-id=\"15ayqgh\" data-start=\"9809\" data-end=\"9879\">The latest approved drawing revision is available to the site team.<\/li>\n<li data-section-id=\"8gmfxd\" data-start=\"9880\" data-end=\"9984\">If any conflict remains, the concrete pour must be suspended until it has been technically reviewed.<\/li>\n<\/ol>\n<h2 data-section-id=\"1r8frcv\" data-start=\"9986\" data-end=\"10015\">Frequently Asked Questions<\/h2>\n<h3 data-section-id=\"gis67x\" data-start=\"10017\" data-end=\"10115\">Can Elevator Shaft Dimensions Before Concrete Casting Be Determined from the Cabin Size Alone?<\/h3>\n<p data-start=\"10117\" data-end=\"10186\">No. Cabin dimensions are important, but they are not the only factor.<\/p>\n<p data-start=\"10188\" data-end=\"10300\">The door, operating system, capacity, speed, pit, headroom, clearances, and fixing points must also be reviewed.<\/p>\n<p data-start=\"10302\" data-end=\"10442\">The shaft dimensions should therefore be approved according to a complete technical elevator drawing rather than the cabin dimensions alone.<\/p>\n<h3 data-section-id=\"14lnix5\" data-start=\"10444\" data-end=\"10559\">Do Elevator Shaft Dimensions Before Concrete Casting Differ Between a Villa Elevator and a Commercial Elevator?<\/h3>\n<p data-start=\"10561\" data-end=\"10596\">Yes, they may differ significantly.<\/p>\n<p data-start=\"10598\" data-end=\"10823\">The intended use, capacity, number of users, system type, and door arrangement all affect the design. A villa elevator may be compact, while a commercial or hospital elevator may require more space and different arrangements.<\/p>\n<p data-start=\"10825\" data-end=\"10970\">The dimensions from one project should not be transferred to another without reviewing the elevator shaft dimensions before concrete casting.<\/p>\n<h3 data-section-id=\"bbpokg\" data-start=\"10972\" data-end=\"11059\">What Happens If the Elevator Shaft Is Smaller Than Required After Concrete Casting?<\/h3>\n<p data-start=\"11061\" data-end=\"11229\">It may be necessary to change the elevator specifications or modify the shaft structurally, depending on the size and location of the shortfall and the required system.<\/p>\n<p data-start=\"11231\" data-end=\"11458\">In some cases, a solution better suited to the available space may be selected. However, the decision must follow an actual technical review because uncontrolled modifications may affect safety, cost, and the project programme.<\/p>\n<h3 data-section-id=\"1ty7pac\" data-start=\"11460\" data-end=\"11524\">Should the Elevator Pit Be Waterproofed Before Installation?<\/h3>\n<p data-start=\"11526\" data-end=\"11717\">The pit should be designed and constructed according to the system requirements and site conditions and protected against water ingress, with waterproofing and drainage requirements reviewed.<\/p>\n<p data-start=\"11719\" data-end=\"11903\">Some elevator standards emphasise protecting the pit from water leakage after components have been installed. This issue should therefore not be postponed until the installation stage.<\/p>\n<h3 data-section-id=\"81m5my\" data-start=\"11905\" data-end=\"11984\">Can an Elevator Be Installed If the Shaft Has Not Been Prepared in Advance?<\/h3>\n<p data-start=\"11986\" data-end=\"12054\">This depends on the elevator type and the condition of the building.<\/p>\n<p data-start=\"12056\" data-end=\"12245\">Some home, external, or custom-designed solutions may reduce the required structural work. However, new buildings usually benefit from confirming shaft requirements during the design stage.<\/p>\n<p data-start=\"12247\" data-end=\"12333\">Marina provides internal, external, and customised solutions according to the project.<\/p>\n<h3 data-section-id=\"304k38\" data-start=\"12335\" data-end=\"12424\">Which Document Should Be Requested from the Elevator Company Before Concrete Casting?<\/h3>\n<p data-start=\"12426\" data-end=\"12468\">Request a clear technical drawing showing:<\/p>\n<ul data-start=\"12470\" data-end=\"12633\">\n<li data-section-id=\"vuyl71\" data-start=\"12470\" data-end=\"12489\">Shaft dimensions.<\/li>\n<li data-section-id=\"wa7woy\" data-start=\"12490\" data-end=\"12509\">Cabin dimensions.<\/li>\n<li data-section-id=\"14nk103\" data-start=\"12510\" data-end=\"12528\">Door dimensions.<\/li>\n<li data-section-id=\"1kuz05i\" data-start=\"12529\" data-end=\"12541\">Pit depth.<\/li>\n<li data-section-id=\"1ml3o29\" data-start=\"12542\" data-end=\"12553\">Headroom.<\/li>\n<li data-section-id=\"my9nr7\" data-start=\"12554\" data-end=\"12567\">Grid lines.<\/li>\n<li data-section-id=\"1s5zv4t\" data-start=\"12568\" data-end=\"12590\">Fixing requirements.<\/li>\n<li data-section-id=\"1vyyl6y\" data-start=\"12591\" data-end=\"12609\">Required levels.<\/li>\n<li data-section-id=\"9e61ju\" data-start=\"12610\" data-end=\"12633\">Selected system data.<\/li>\n<\/ul>\n<p data-start=\"12635\" data-end=\"12800\">This document provides the reference that allows the engineering consultant and contractor to review the work before the formwork is closed and the concrete is cast.<\/p>\n<h2 data-section-id=\"8dtpi\" data-start=\"12802\" data-end=\"12815\">Conclusion<\/h2>\n<p data-start=\"12817\" data-end=\"13048\">The most important rule when determining elevator shaft dimensions before concrete casting is not to treat them as a memorised standard figure. They should result from precise coordination between the elevator and the building.<\/p>\n<p data-start=\"13050\" data-end=\"13227\">Selecting the system first and then approving and reviewing its drawings structurally and architecturally reduces the risk of demolition, modifications, and installation delays.<\/p>\n<p data-start=\"13229\" data-end=\"13432\">If your project in Saudi Arabia is still in the design or structural construction stage, the Marina Platforms Saudi Arabia team can review your requirements and identify a suitable solution for the site.<\/p>\n<p data-start=\"13434\" data-end=\"13600\" data-is-last-node=\"\" data-is-only-node=\"\">Request a technical consultation and customised quotation before concrete casting instead of discovering dimensional conflicts after the structure has been completed.<\/p>\n<p><\/p>","protected":false},"featured_media":1046,"template":"","class_list":["post-1031","blogs","type-blogs","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/marina-sa.com\/en\/wp-json\/wp\/v2\/blogs\/1031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marina-sa.com\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/marina-sa.com\/en\/wp-json\/wp\/v2\/types\/blogs"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marina-sa.com\/en\/wp-json\/wp\/v2\/media\/1046"}],"wp:attachment":[{"href":"https:\/\/marina-sa.com\/en\/wp-json\/wp\/v2\/media?parent=1031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}